A bridge walked into a bar. The bartender said, 'Why the long span?'
A bridge walked into a bar. The bartender said, 'Why the long span?'
Over 5 billion bridge crossings happen every single day in America.
over RR & CITY STREETS
0.2 N JCT SR 181
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 6 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 77,251 vehicles per day and is 61 years old (reconstructed in 2009).
Its sufficiency rating of 51.0 places it below the national average of 63.6.
The NBI records a navigation clearance of 26 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 765 feet long — a moderate crossing, about 30 seconds.
A standard overpass design with solid barriers on each side.
About 26 feet above ground — moderate height, similar to a 3-5 story building.
About 77,251 vehicles cross daily — heavy traffic, congestion likely during rush hours.
The deck is 118 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1965
61 years old (rebuilt 2009)
Structure Type
Prestressed Concrete Stringer/Multi-beam/Girder
Total Length
765 ft
233.2 m
Deck Width
118 ft
36.1 m
Spans
8
sections between supports
Max Span
110 ft
longest unsupported section (33.5 m)
Traffic Lanes
8 lanes
One-way traffic
Clearance Below
26 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
77,251vehicles/day
47.46478°N, 122.24220°W
Prestressed Concrete Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Washington to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.