Why did the truss bridge break up with the beam bridge? It needed more support.
Why did the truss bridge break up with the beam bridge? It needed more support.
Why was the bridge always tired? Too many crossings.
over WEST BRADDOCK ROAD
0.35FR SEM.RD./0.55TO7
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 5 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 187,090 vehicles per day and is 56 years old.
Its sufficiency rating of 63.4 places it below the national average of 63.6.
The NBI records a navigation clearance of 18 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 152 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
About 18 feet above ground — moderate height, similar to a 3-5 story building.
About 187,090 vehicles cross daily — very heavy traffic, high congestion risk.
The deck is 239 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1970
56 years old
Structure Type
Steel Stringer/Multi-beam/Girder
Total Length
152 ft
46.3 m
Deck Width
239 ft
72.9 m
Spans
2
sections between supports
Max Span
76 ft
longest unsupported section (23.2 m)
Traffic Lanes
13 lanes
Two-way traffic
Clearance Below
18 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
187,090vehicles/day
38.83167°N, 77.10784°W
Steel Stringer/Multi-beam/Girder
A steel stringer bridge uses parallel steel beams (stringers) to support the deck. This is one of the most common bridge types in the US, valued for its simplicity and strength.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Virginia to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.