Why do engineers love bridges? They're outstanding in their field.
Why do engineers love bridges? They're outstanding in their field.
Why was the bridge always tired? Too many crossings.
over I-15 (SR-15) NBL and SBL
4400 SO.ST.in RIVERDALE
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Poor overall condition rating of 4 out of 9. This bridge is classified as being in poor condition, meaning one or more structural components have significant deterioration. Poor condition does not mean the bridge is unsafe to drive on, but it does mean repairs or replacement may be needed.
The bridge carries 9,768 vehicles per day and is 60 years old.
Its sufficiency rating of 48.5 places it below the national average of 63.6.
The NBI records a navigation clearance of 18 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 239 feet long — a short crossing, about 10-15 seconds.
A standard overpass design with solid barriers on each side.
About 18 feet above ground — moderate height, similar to a 3-5 story building.
About 9,768 vehicles cross daily — light traffic, a smooth crossing.
The deck is 33 feet wide with 2-3 lanes — moderate width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1966
60 years old
Structure Type
Concrete (Continuous) Tee Beam
Total Length
239 ft
72.9 m
Deck Width
33 ft
10.2 m
Spans
4
sections between supports
Max Span
81 ft
longest unsupported section (24.7 m)
Traffic Lanes
2 lanes
Two-way traffic
Clearance Below
18 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
9,768vehicles/day
41.18333°N, 112.01333°W
Concrete (Continuous) Tee Beam
A concrete tee beam bridge uses T-shaped cross-section beams where the top flange serves as part of the deck, efficiently using concrete in both compression and tension.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Utah to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.