Analyzing deck conditions, superstructure ratings, and bad puns...
Analyzing deck conditions, superstructure ratings, and bad puns...
Why did the truss bridge break up with the beam bridge? It needed more support.
over I15RPS UPRR & 2100 S
2100 SOUTH INTCHG.in SLC.
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 6 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 138,665 vehicles per day and is 26 years old.
Its sufficiency rating of 70.3 is above the national average of 63.6.
The NBI records a navigation clearance of 17 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge has some features that may be challenging for travelers with bridge anxiety. See the tips below for a more comfortable crossing.
This bridge is 2293 feet long — a longer crossing, over 1 minute.
A standard overpass design with solid barriers on each side.
About 17 feet above ground — moderate height, similar to a 3-5 story building.
About 138,665 vehicles cross daily — very heavy traffic, high congestion risk.
The deck is 31 feet wide with 1-2 lanes — a narrower crossing.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
2000
26 years old
Structure Type
Steel (Continuous) Stringer/Multi-beam/Girder
Total Length
2,293 ft
698.8 m
Deck Width
31 ft
9.3 m
Spans
14
sections between supports
Max Span
217 ft
longest unsupported section (66.0 m)
Traffic Lanes
1 lane
One-way traffic
Clearance Below
17 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
138,665vehicles/day
40.72689°N, 111.90549°W
Steel (Continuous) Stringer/Multi-beam/Girder
A steel stringer bridge uses parallel steel beams (stringers) to support the deck. This is one of the most common bridge types in the US, valued for its simplicity and strength.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Utah to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.