Why did the bridge go to therapy? It had too many spans of anxiety.
Why did the bridge go to therapy? It had too many spans of anxiety.
The average US bridge is 48 years old. That's a lot of birthday candles.
over 8000 SOUTH ST.(WASATCH)
400 W.8000 SO.IN MIDVALE
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 6 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 230,000 vehicles per day and is 28 years old (reconstructed in 2009).
Its sufficiency rating of 68.4 is above the national average of 63.6.
The NBI records a navigation clearance of 20 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 126 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
About 20 feet above ground — moderate height, similar to a 3-5 story building.
About 230,000 vehicles cross daily — very heavy traffic, high congestion risk.
The deck is 109 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1998
28 years old (rebuilt 2009)
Structure Type
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
Total Length
126 ft
38.5 m
Deck Width
109 ft
33.2 m
Spans
3
sections between supports
Max Span
70 ft
longest unsupported section (21.3 m)
Traffic Lanes
7 lanes
One-way traffic
Clearance Below
20 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
230,000vehicles/day
40.60618°N, 111.90545°W
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Utah to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.