What did one bridge say to the other? 'You're looking a bit stressed.'
What did one bridge say to the other? 'You're looking a bit stressed.'
41,685 bridges are in poor condition. But this loading screen isn't one of them.
over US 183 AND IH35 MAINLANE
IH35/US183 INTERCHANGE
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 6 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 148,000 vehicles per day and is 28 years old (reconstructed in 2021).
Its sufficiency rating of 68.3 is above the national average of 63.6.
The NBI records a navigation clearance of 16 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge has some features that may be challenging for travelers with bridge anxiety. See the tips below for a more comfortable crossing.
This bridge is 1943 feet long — a longer crossing, over 1 minute.
A standard bridge design.
About 16 feet above ground — moderate height, similar to a 3-5 story building.
About 148,000 vehicles cross daily — very heavy traffic, high congestion risk.
The deck is 28 feet wide with 1-2 lanes — a narrower crossing.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1998
28 years old (rebuilt 2021)
Structure Type
Prestressed Concrete (Continuous) Segmental Box Girder
Total Length
1,943 ft
592.2 m
Deck Width
28 ft
8.5 m
Spans
11
sections between supports
Max Span
178 ft
longest unsupported section (54.3 m)
Traffic Lanes
1 lane
One-way traffic
Clearance Below
16 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
148,000vehicles/day
30.33863°N, 97.70028°W
Prestressed Concrete (Continuous) Segmental Box Girder
A prestressed concrete box beam bridge combines hollow box sections with prestressing technology, enabling longer spans with reduced weight and material usage.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Texas to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.