If I had a dime for every bridge I've crossed, I'd have about ten bucks by now.
If I had a dime for every bridge I've crossed, I'd have about ten bucks by now.
If I had a dime for every bridge I've crossed, I'd have about ten bucks by now.
over SH 183 WB TX Plaza Dr
Loop 12 @ SH 183
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 7 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 40,991 vehicles per day and is 7 years old.
Its sufficiency rating of 70.3 is above the national average of 63.6.
The NBI records a navigation clearance of 18 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge has some features that may be challenging for travelers with bridge anxiety. See the tips below for a more comfortable crossing.
This bridge is 3510 feet long — an extended crossing, several minutes.
A standard overpass design with solid barriers on each side.
About 18 feet above ground — moderate height, similar to a 3-5 story building.
About 40,991 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 48 feet wide with 2-3 lanes — moderate width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
2019
7 years old
Structure Type
Prestressed Concrete Stringer/Multi-beam/Girder
Total Length
3,510 ft
1069.8 m
Deck Width
48 ft
14.6 m
Spans
24
sections between supports
Max Span
150 ft
longest unsupported section (45.7 m)
Traffic Lanes
2 lanes
Two-way traffic
Clearance Below
18 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
40,991vehicles/day
32.83823°N, 96.91545°W
Prestressed Concrete Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Texas to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.