Why do engineers love bridges? They're outstanding in their field.
Why do engineers love bridges? They're outstanding in their field.
What do you call a bridge that tells jokes? A pun-toon bridge.
over NFA A073 & BIG CREEK
IN ALTAMONT CITY LIMITS
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 5 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 3,511 vehicles per day and is 62 years old.
Its sufficiency rating of 65.3 is above the national average of 63.6.
The NBI records a navigation clearance of 24 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 255 feet long — a short crossing, about 10-15 seconds.
A standard overpass design with solid barriers on each side.
About 24 feet above ground — moderate height, similar to a 3-5 story building.
About 3,511 vehicles cross daily — light traffic, a smooth crossing.
The deck is 34 feet wide with 2-3 lanes — moderate width.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1964
62 years old
Structure Type
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
Total Length
255 ft
77.6 m
Deck Width
34 ft
10.5 m
Spans
5
sections between supports
Max Span
51 ft
longest unsupported section (15.6 m)
Traffic Lanes
2 lanes
Two-way traffic
Clearance Below
24 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
3,511vehicles/day
35.41325°N, 85.70506°W
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Tennessee to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.