Why did the truss bridge break up with the beam bridge? It needed more support.
Why did the truss bridge break up with the beam bridge? It needed more support.
Loading 624,191 bridges... give or take a few.
over I24 RL / BRICK CHURCH LN
IN N.E. DAVIDSON CO.
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 7 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 58,248 vehicles per day and is 54 years old.
Its sufficiency rating of 72.4 is above the national average of 63.6.
The NBI records a navigation clearance of 14 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 146 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
About 14 feet above ground — standard overpass height.
About 58,248 vehicles cross daily — heavy traffic, congestion likely during rush hours.
The deck is 44 feet wide with 2-3 lanes — moderate width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1972
54 years old
Structure Type
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
Total Length
146 ft
44.5 m
Deck Width
44 ft
13.4 m
Spans
3
sections between supports
Max Span
78 ft
longest unsupported section (23.8 m)
Traffic Lanes
2 lanes
One-way traffic
Clearance Below
14 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
58,248vehicles/day
36.24467°N, 86.78484°W
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Tennessee to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.