Why did the truss bridge break up with the beam bridge? It needed more support.
Why did the truss bridge break up with the beam bridge? It needed more support.
Analyzing deck conditions, superstructure ratings, and bad puns...
over FOUR HOLE SWAMP
14.3 MI SE ST GEORGE
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 6 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 23,550 vehicles per day and is 65 years old (reconstructed in 1982).
Its sufficiency rating of 69.2 is above the national average of 63.6.
The NBI records a navigation clearance of 100 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge has some features that may be challenging for travelers with bridge anxiety. See the tips below for a more comfortable crossing.
This bridge is 750 feet long — a moderate crossing, about 30 seconds.
A standard overpass design with solid barriers on each side.
About 100 feet above ground — a high bridge with significant elevation.
About 23,550 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 43 feet wide with 2-3 lanes — moderate width.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1961
65 years old (rebuilt 1982)
Structure Type
Concrete Tee Beam
Total Length
750 ft
228.6 m
Deck Width
43 ft
13.0 m
Spans
25
sections between supports
Max Span
30 ft
longest unsupported section (9.1 m)
Traffic Lanes
2 lanes
One-way traffic
Clearance Below
100 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
23,550vehicles/day
33.14688°N, 80.33090°W
Concrete Tee Beam
A concrete tee beam bridge uses T-shaped cross-section beams where the top flange serves as part of the deck, efficiently using concrete in both compression and tension.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track South Carolina to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.