Why do engineers love bridges? They're outstanding in their field.
Why do engineers love bridges? They're outstanding in their field.
Loading... unlike some bridges, we promise not to leave you hanging.
over LA PLATA RIVER & PR
2.8 KM SOUTH OF TOA BAJA
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 5 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 52,500 vehicles per day and is 41 years old.
Its sufficiency rating of 62.7 places it below the national average of 63.6.
The NBI records a navigation clearance of 22 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge has some features that may be challenging for travelers with bridge anxiety. See the tips below for a more comfortable crossing.
This bridge is 4240 feet long — an extended crossing, several minutes.
A standard overpass design with solid barriers on each side.
About 22 feet above ground — moderate height, similar to a 3-5 story building.
About 52,500 vehicles cross daily — heavy traffic, congestion likely during rush hours.
The deck is 46 feet wide with 2-3 lanes — moderate width.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1985
41 years old
Structure Type
Prestressed Concrete Stringer/Multi-beam/Girder
Total Length
4,240 ft
1292.3 m
Deck Width
46 ft
14.0 m
Spans
37
sections between supports
Max Span
117 ft
longest unsupported section (35.6 m)
Traffic Lanes
2 lanes
One-way traffic
Clearance Below
22 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
52,500vehicles/day
18.41934°N, 66.26414°W
Prestressed Concrete Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Puerto Rico to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.