over PR 18 NB PR 22 WB KM 2
int. of PR-18 With PR-22
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 6 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 239,000 vehicles per day and is 19 years old.
Its sufficiency rating of 68.0 is above the national average of 63.6.
The NBI records a navigation clearance of 16 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge has some features that may be challenging for travelers with bridge anxiety. See the tips below for a more comfortable crossing.
This bridge is 1543 feet long — a moderate crossing, about 30 seconds.
A standard overpass design with solid barriers on each side.
About 16 feet above ground — moderate height, similar to a 3-5 story building.
About 239,000 vehicles cross daily — very heavy traffic, high congestion risk.
The deck is 31 feet wide with 1-2 lanes — a narrower crossing.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
2007
19 years old
Structure Type
Prestressed Concrete Stringer/Multi-beam/Girder
Total Length
1,543 ft
470.4 m
Deck Width
31 ft
9.5 m
Spans
16
sections between supports
Max Span
121 ft
longest unsupported section (37.0 m)
Traffic Lanes
1 lane
One-way traffic
Clearance Below
16 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
239,000vehicles/day
18.42861°N, 66.07444°W
Prestressed Concrete Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Puerto Rico to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.