Loading... unlike some bridges, we promise not to leave you hanging.
Loading... unlike some bridges, we promise not to leave you hanging.
Why did the truss bridge break up with the beam bridge? It needed more support.
over 2029 St Johns Church Rd
CAMP HILL
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 5 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 71,128 vehicles per day and is 65 years old (reconstructed in 1996).
Its sufficiency rating of 59.5 places it below the national average of 63.6.
The NBI records a navigation clearance of 14 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge is likely to be a comfortable crossing for most travelers.
This bridge is 74 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
About 14 feet above ground — standard overpass height.
About 71,128 vehicles cross daily — heavy traffic, congestion likely during rush hours.
The deck is 72 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1961
65 years old (rebuilt 1996)
Structure Type
Prestressed Concrete Box Beam (Multiple)
Total Length
74 ft
22.6 m
Deck Width
72 ft
21.8 m
Spans
1
sections between supports
Max Span
73 ft
longest unsupported section (22.3 m)
Traffic Lanes
4 lanes
Two-way traffic
Clearance Below
14 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
71,128vehicles/day
40.23315°N, 76.95621°W
Prestressed Concrete Box Beam (Multiple)
A prestressed concrete box beam bridge combines hollow box sections with prestressing technology, enabling longer spans with reduced weight and material usage.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Pennsylvania to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.