Gathering condition ratings from coast to coast...
Gathering condition ratings from coast to coast...
Connecting the data points... literally.
over B&P RAILROAD
HARMONY MAIN STREET
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Poor overall condition rating of 4 out of 9. This bridge is classified as being in poor condition, meaning one or more structural components have significant deterioration. Poor condition does not mean the bridge is unsafe to drive on, but it does mean repairs or replacement may be needed.
The bridge carries 50 vehicles per day and is 110 years old (reconstructed in 1978).
Its sufficiency rating of 46.3 places it below the national average of 63.6.
The NBI records a navigation clearance of 20 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge is likely to be a comfortable crossing for most travelers.
This bridge is 33 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
About 20 feet above ground — moderate height, similar to a 3-5 story building.
Only about 50 vehicles cross daily — very light traffic with low congestion risk.
The deck is 39 feet wide with 2-3 lanes — moderate width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1916
110 years old (rebuilt 1978)
Structure Type
Prestressed Concrete Box Beam (Multiple)
Total Length
33 ft
10.1 m
Deck Width
39 ft
12.0 m
Spans
1
sections between supports
Max Span
29 ft
longest unsupported section (8.8 m)
Traffic Lanes
2 lanes
Two-way traffic
Clearance Below
20 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
50vehicles/day
40.80210°N, 80.12760°W
Prestressed Concrete Box Beam (Multiple)
A prestressed concrete box beam bridge combines hollow box sections with prestressing technology, enabling longer spans with reduced weight and material usage.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Pennsylvania to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.