Analyzing deck conditions, superstructure ratings, and bad puns...
Analyzing deck conditions, superstructure ratings, and bad puns...
Fun fact: The average American crosses 4 bridges a day without even noticing.
over WASHINGTON BLVD (RT 8)
047 Larimer Ave over Wash
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Poor overall condition rating of 4 out of 9. This bridge is classified as being in poor condition, meaning one or more structural components have significant deterioration. Poor condition does not mean the bridge is unsafe to drive on, but it does mean repairs or replacement may be needed.
The bridge carries 8,000 vehicles per day and is 114 years old (reconstructed in 1979).
Its sufficiency rating of 49.1 places it below the national average of 63.6.
The NBI records a navigation clearance of 70 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 548 feet long — a short crossing, about 10-15 seconds.
An arch bridge design with some openness to the surroundings.
About 70 feet above ground — an elevated crossing, similar to a 5-10 story building.
About 8,000 vehicles cross daily — light traffic, a smooth crossing.
The deck is 46 feet wide with 2-3 lanes — moderate width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1912
114 years old (rebuilt 1979)
Structure Type
Concrete Arch (Deck)
Total Length
548 ft
167.0 m
Deck Width
46 ft
14.0 m
Spans
1
sections between supports
Max Span
300 ft
longest unsupported section (91.4 m)
Traffic Lanes
2 lanes
Two-way traffic
Clearance Below
70 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
8,000vehicles/day
40.46751°N, 79.90877°W
Concrete Arch (Deck)
A concrete arch bridge uses a curved concrete structure to transfer loads through compression. Concrete arches are durable and can be very aesthetically pleasing.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Pennsylvania to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.