Almost there! Just bridging the gap...
Almost there! Just bridging the gap...
Almost there! Just bridging the gap...
over IR 670 M.L.OVR SCIOTO RV
EAST OF GRANDVIEW AVE
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 8 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 80,607 vehicles per day and is 24 years old.
Its sufficiency rating of 76.3 is above the national average of 63.6.
The NBI records a navigation clearance of 12 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 329 feet long — a short crossing, about 10-15 seconds.
A standard overpass design with solid barriers on each side.
About 12 feet above ground — standard overpass height.
About 80,607 vehicles cross daily — heavy traffic, congestion likely during rush hours.
The deck is 146 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
2002
24 years old
Structure Type
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
Total Length
329 ft
100.2 m
Deck Width
146 ft
44.4 m
Spans
4
sections between supports
Max Span
109 ft
longest unsupported section (33.2 m)
Traffic Lanes
8 lanes
Two-way traffic
Clearance Below
12 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
80,607vehicles/day
39.96823°N, 83.04399°W
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Ohio to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.