Why did the truss bridge break up with the beam bridge? It needed more support.
Why did the truss bridge break up with the beam bridge? It needed more support.
A bridge walked into a bar. The bartender said, 'Why the long span?'
over N.PACOLET RIVER SR1516
2.5 MI.E.JCT.NC108
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 7 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 13,750 vehicles per day and is 60 years old (reconstructed in 2002).
Its sufficiency rating of 71.8 is above the national average of 63.6.
The NBI records a navigation clearance of 14 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 325 feet long — a short crossing, about 10-15 seconds.
A standard overpass design with solid barriers on each side.
About 14 feet above ground — standard overpass height.
About 13,750 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 43 feet wide with 2-3 lanes — moderate width.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1966
60 years old (rebuilt 2002)
Structure Type
Steel Stringer/Multi-beam/Girder
Total Length
325 ft
99.0 m
Deck Width
43 ft
13.1 m
Spans
6
sections between supports
Max Span
70 ft
longest unsupported section (21.3 m)
Traffic Lanes
2 lanes
One-way traffic
Clearance Below
14 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
13,750vehicles/day
35.21478°N, 82.18571°W
Steel Stringer/Multi-beam/Girder
A steel stringer bridge uses parallel steel beams (stringers) to support the deck. This is one of the most common bridge types in the US, valued for its simplicity and strength.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track North Carolina to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.