What's a bridge's favorite exercise? Cross-fit.
What's a bridge's favorite exercise? Cross-fit.
Why did the truss bridge break up with the beam bridge? It needed more support.
over YADKIN RIVER ACCESS ROAD
1.3 MI. E. JCT. NC801
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 7 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 46,000 vehicles per day and is 7 years old.
Its sufficiency rating of 78.8 is above the national average of 63.6.
The NBI records a navigation clearance of 20 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 1104 feet long — a moderate crossing, about 30 seconds.
A standard overpass design with solid barriers on each side.
About 20 feet above ground — moderate height, similar to a 3-5 story building.
About 46,000 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 125 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
2019
7 years old
Structure Type
Prestressed Concrete Stringer/Multi-beam/Girder
Total Length
1,104 ft
336.5 m
Deck Width
125 ft
38.1 m
Spans
8
sections between supports
Max Span
153 ft
longest unsupported section (46.6 m)
Traffic Lanes
2 lanes
One-way traffic
Clearance Below
20 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
46,000vehicles/day
36.01632°N, 80.41841°W
Prestressed Concrete Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track North Carolina to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.