Why did the truss bridge break up with the beam bridge? It needed more support.
Why did the truss bridge break up with the beam bridge? It needed more support.
The Brooklyn Bridge was sold to gullible tourists so many times it became a saying.
over NC216
1.6 MI. N. JCT. SR2278
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 5 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 21,500 vehicles per day and is 68 years old (reconstructed in 1990).
Its sufficiency rating of 57.7 places it below the national average of 63.6.
The NBI records a navigation clearance of 14 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge is likely to be a comfortable crossing for most travelers.
This bridge is 163 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
About 14 feet above ground — standard overpass height.
About 21,500 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 42 feet wide with 2-3 lanes — moderate width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1958
68 years old (rebuilt 1990)
Structure Type
Prestressed Concrete Stringer/Multi-beam/Girder
Total Length
163 ft
49.6 m
Deck Width
42 ft
12.8 m
Spans
3
sections between supports
Max Span
60 ft
longest unsupported section (18.2 m)
Traffic Lanes
2 lanes
One-way traffic
Clearance Below
14 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
21,500vehicles/day
35.17872°N, 81.41438°W
Prestressed Concrete Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track North Carolina to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.