Why do engineers love bridges? They're outstanding in their field.
Why do engineers love bridges? They're outstanding in their field.
What's a bridge's favorite exercise? Cross-fit.
over WILDLIFE CROSSING
2.7 MI.W. JCT.US74 US76
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 8 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 5,750 vehicles per day and is 11 years old.
Its sufficiency rating of 79.8 is above the national average of 63.6.
For travelers with bridge anxiety
This bridge is likely to be a comfortable crossing for most travelers.
This bridge is 158 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
No height data available — likely a standard overpass height.
About 5,750 vehicles cross daily — light traffic, a smooth crossing.
The deck is 45 feet wide with 2-3 lanes — moderate width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
2015
11 years old
Structure Type
Prestressed Concrete Stringer/Multi-beam/Girder
Total Length
158 ft
48.1 m
Deck Width
45 ft
13.8 m
Spans
2
sections between supports
Max Span
76 ft
longest unsupported section (23.1 m)
Traffic Lanes
2 lanes
One-way traffic
Daily Traffic
5,750vehicles/day
34.21854°N, 78.07707°W
Prestressed Concrete Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track North Carolina to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.