Why did the truss bridge break up with the beam bridge? It needed more support.
Why did the truss bridge break up with the beam bridge? It needed more support.
Why did the bridge go to therapy? It had too many spans of anxiety.
over ERIE CANAL
JCT RTE 32 & ERIE CANAL
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 5 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 14,078 vehicles per day and is 119 years old (reconstructed in 2004).
Its sufficiency rating of 60.6 places it below the national average of 63.6.
The NBI records a navigation clearance of 20 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 128 feet long — a quick crossing, under 5 seconds at highway speed.
A truss bridge — the steel framework can provide a sense of enclosure.
About 20 feet above ground — moderate height, similar to a 3-5 story building.
About 14,078 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 55 feet wide with 3-4 lanes — standard width.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1907
119 years old (rebuilt 2004)
Structure Type
Steel Truss (Thru)
Total Length
128 ft
39.0 m
Deck Width
55 ft
16.8 m
Spans
1
sections between supports
Max Span
122 ft
longest unsupported section (37.1 m)
Traffic Lanes
2 lanes
Two-way traffic
Clearance Below
20 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
14,078vehicles/day
42.79163°N, 73.68441°W
Steel Truss (Thru)
A steel truss bridge uses a framework of interconnected triangular elements. The geometric rigidity of triangles makes this design extremely efficient at distributing loads.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track New York to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.