Loading... unlike some bridges, we promise not to leave you hanging.
Loading... unlike some bridges, we promise not to leave you hanging.
Did you know? The oldest bridge in the NBI was built in 1697.
over I-10 Ramp Loop 002-2
West Deming Interchange
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 7 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 16,029 vehicles per day and is 57 years old (reconstructed in 2002).
Its sufficiency rating of 70.3 is above the national average of 63.6.
The NBI records a navigation clearance of 16 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge is likely to be a comfortable crossing for most travelers.
This bridge is 140 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
About 16 feet above ground — standard overpass height.
About 16,029 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 41 feet wide with 2-3 lanes — moderate width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1969
57 years old (rebuilt 2002)
Structure Type
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
Total Length
140 ft
42.7 m
Deck Width
41 ft
12.5 m
Spans
3
sections between supports
Max Span
53 ft
longest unsupported section (16.1 m)
Traffic Lanes
2 lanes
One-way traffic
Clearance Below
16 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
16,029vehicles/day
32.26810°N, 107.77700°W
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track New Mexico to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.