A bridge walked into a bar. The bartender said, 'Why the long span?'
A bridge walked into a bar. The bartender said, 'Why the long span?'
Did you know? The oldest bridge in the NBI was built in 1697.
over Lead Avenue
1.4 M S Jct I-25/I-40
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 5 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 111,396 vehicles per day and is 65 years old (reconstructed in 1967).
Its sufficiency rating of 60.6 places it below the national average of 63.6.
The NBI records a navigation clearance of 15 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 152 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
About 15 feet above ground — standard overpass height.
About 111,396 vehicles cross daily — very heavy traffic, high congestion risk.
The deck is 54 feet wide with 3-4 lanes — standard width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1961
65 years old (rebuilt 1967)
Structure Type
Prestressed Concrete Stringer/Multi-beam/Girder
Total Length
152 ft
46.3 m
Deck Width
54 ft
16.5 m
Spans
3
sections between supports
Max Span
63 ft
longest unsupported section (19.1 m)
Traffic Lanes
3 lanes
One-way traffic
Clearance Below
15 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
111,396vehicles/day
35.07971°N, 106.63713°W
Prestressed Concrete Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track New Mexico to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.