Why did the bridge go to therapy? It had too many spans of anxiety.
Why did the bridge go to therapy? It had too many spans of anxiety.
Fun fact: The average American crosses 4 bridges a day without even noticing.
over BERKSHIRE VAL. RD & RR
1.9 MI WEST OF NJ 15
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 7 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 58,925 vehicles per day and is 67 years old (reconstructed in 2011).
Its sufficiency rating of 75.8 is above the national average of 63.6.
The NBI records a navigation clearance of 27 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 198 feet long — a short crossing, about 10-15 seconds.
A standard overpass design with solid barriers on each side.
About 27 feet above ground — moderate height, similar to a 3-5 story building.
About 58,925 vehicles cross daily — heavy traffic, congestion likely during rush hours.
The deck is 57 feet wide with 3-4 lanes — standard width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1959
67 years old (rebuilt 2011)
Structure Type
Prestressed Concrete Stringer/Multi-beam/Girder
Total Length
198 ft
60.4 m
Deck Width
57 ft
17.4 m
Spans
4
sections between supports
Max Span
61 ft
longest unsupported section (18.6 m)
Traffic Lanes
3 lanes
One-way traffic
Clearance Below
27 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
58,925vehicles/day
40.90456°N, 74.60999°W
Prestressed Concrete Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track New Jersey to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.