Analyzing deck conditions, superstructure ratings, and bad puns...
Analyzing deck conditions, superstructure ratings, and bad puns...
Why do engineers love bridges? They're outstanding in their field.
Montana
Total Bridges
26
Poor Condition
15.4%
Avg Sufficiency
58.9
Avg Age
59 yrs
Total Bridges
26
Poor Condition
4(15.4%)
Good or Better
14
Avg Sufficiency
58.9
Average Age
59 yrs
Daily Crossings
3K
Showing 1 - 20 of 26 bridges
over CANAL 030
over SO FK BUFFALO CR 011
over BOX ELDER CREEK 007
over BUFFALO CREEK 006
over Flatwilow Creek
over SACAGAWEA RIVER
over FLATWILLOW CREEK 016
over FLATWILLOW CREEK 013
over MCDONALD CREEK 015
over BOX ELDER CREEK 008
over MCDONALD CREEK 003
over MCDONALD CREEK 014
over ALKALI CREEK
over DRAG CREEK
over BOX ELDER CREEK
over DRAINAGE
over DRAINAGE
over FLATWILLOW CREEK
over MCDONALD CREEK
over PIKE CREEK