The Golden Gate Bridge uses 80,000 miles of wire in its cables.
The Golden Gate Bridge uses 80,000 miles of wire in its cables.
Why did the bridge go to therapy? It had too many spans of anxiety.
over ST JOSEPH River
00.30 E OF PORTAGE ROAD
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 6 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 10,603 vehicles per day and is 86 years old (reconstructed in 2004).
Its sufficiency rating of 67.3 is above the national average of 63.6.
The NBI records a navigation clearance of 20 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 257 feet long — a short crossing, about 10-15 seconds.
An arch bridge design with some openness to the surroundings.
About 20 feet above ground — moderate height, similar to a 3-5 story building.
About 10,603 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 53 feet wide with 3-4 lanes — standard width.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1940
86 years old (rebuilt 2004)
Structure Type
Concrete Arch (Deck)
Total Length
257 ft
78.3 m
Deck Width
53 ft
16.1 m
Spans
3
sections between supports
Max Span
80 ft
longest unsupported section (24.3 m)
Traffic Lanes
2 lanes
Two-way traffic
Clearance Below
20 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
10,603vehicles/day
41.69328°N, 86.26305°W
Concrete Arch (Deck)
A concrete arch bridge uses a curved concrete structure to transfer loads through compression. Concrete arches are durable and can be very aesthetically pleasing.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Indiana to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.