The average US bridge is 48 years old. That's a lot of birthday candles.
The average US bridge is 48 years old. That's a lot of birthday candles.
What did one bridge say to the other? 'You're looking a bit stressed.'
over ST MARYS RIVER & PARK TR
00.20 N WINCHESTER RD
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 5 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 23,000 vehicles per day and is 54 years old (reconstructed in 1998).
Its sufficiency rating of 61.0 places it below the national average of 63.6.
The NBI records a navigation clearance of 11 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 340 feet long — a short crossing, about 10-15 seconds.
A standard overpass design with solid barriers on each side.
About 11 feet above ground — standard overpass height.
About 23,000 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 88 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1972
54 years old (rebuilt 1998)
Structure Type
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
Total Length
340 ft
103.6 m
Deck Width
88 ft
26.8 m
Spans
5
sections between supports
Max Span
68 ft
longest unsupported section (20.7 m)
Traffic Lanes
4 lanes
Two-way traffic
Clearance Below
11 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
23,000vehicles/day
41.02905°N, 85.14758°W
Prestressed Concrete (Continuous) Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Indiana to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.