Bridges: the original social network. Connecting communities since 850 BC.
Bridges: the original social network. Connecting communities since 850 BC.
Why did the truss bridge break up with the beam bridge? It needed more support.
over I-75 W-N CONN & NW138 ST
I-75/SR-826 INTERCHANGE
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 7 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 2,100 vehicles per day and is 40 years old.
Its sufficiency rating of 70.1 is above the national average of 63.6.
The NBI records a navigation clearance of 16 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 276 feet long — a short crossing, about 10-15 seconds.
A standard bridge design.
About 16 feet above ground — standard overpass height.
About 2,100 vehicles cross daily — light traffic, a smooth crossing.
The deck is 31 feet wide with 1-2 lanes — a narrower crossing.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1986
40 years old
Structure Type
Prestressed Concrete (Continuous) Segmental Box Girder
Total Length
276 ft
84.1 m
Deck Width
31 ft
9.4 m
Spans
2
sections between supports
Max Span
138 ft
longest unsupported section (42.1 m)
Traffic Lanes
1 lane
One-way traffic
Clearance Below
16 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
2,100vehicles/day
25.89873°N, 80.32702°W
Prestressed Concrete (Continuous) Segmental Box Girder
A prestressed concrete box beam bridge combines hollow box sections with prestressing technology, enabling longer spans with reduced weight and material usage.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Florida to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.