Why was the bridge always tired? Too many crossings.
Why was the bridge always tired? Too many crossings.
Fun fact: The average American crosses 4 bridges a day without even noticing.
over W 60TH ST (NW 114TH ST)
0.5MI. S OF W 68TH ST.
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 7 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 29,500 vehicles per day and is 24 years old.
Its sufficiency rating of 77.6 is above the national average of 63.6.
The NBI records a navigation clearance of 17 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge is likely to be a comfortable crossing for most travelers.
This bridge is 106 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
About 17 feet above ground — moderate height, similar to a 3-5 story building.
About 29,500 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 198 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
2002
24 years old
Structure Type
Prestressed Concrete Stringer/Multi-beam/Girder
Total Length
106 ft
32.3 m
Deck Width
198 ft
60.4 m
Spans
1
sections between supports
Max Span
106 ft
longest unsupported section (32.3 m)
Traffic Lanes
13 lanes
Two-way traffic
Clearance Below
17 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
29,500vehicles/day
25.87700°N, 80.32333°W
Prestressed Concrete Stringer/Multi-beam/Girder
A prestressed concrete stringer bridge uses pretensioned concrete beams, where steel tendons are stretched before concrete is poured. This creates stronger, lighter spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Florida to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.