This bridge has a Good overall condition rating of 7 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 19,500 vehicles per day and is 21 years old.
Its sufficiency rating of 73.1 is above the national average of 63.6.
The NBI records a navigation clearance of 18 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge has some features that may be challenging for travelers with bridge anxiety. See the tips below for a more comfortable crossing.
This bridge is 3574 feet long — an extended crossing, several minutes.
A standard bridge design.
About 18 feet above ground — moderate height, similar to a 3-5 story building.
About 19,500 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 43 feet wide with 2-3 lanes — moderate width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
2005
21 years old
Structure Type
Prestressed Concrete (Continuous) Segmental Box Girder
Total Length
3,574 ft
1089.4 m
Deck Width
43 ft
13.0 m
Spans
18
sections between supports
Max Span
221 ft
longest unsupported section (67.5 m)
Traffic Lanes
2 lanes
One-way traffic
Clearance Below
18 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
19,500vehicles/day
30.16778°N, 81.55889°W
Prestressed Concrete (Continuous) Segmental Box Girder
A prestressed concrete box beam bridge combines hollow box sections with prestressing technology, enabling longer spans with reduced weight and material usage.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Florida to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.