The average US bridge is 48 years old. That's a lot of birthday candles.
The average US bridge is 48 years old. That's a lot of birthday candles.
If I had a dime for every bridge I've crossed, I'd have about ten bucks by now.
over CONNECTICUT RV FERRY RD
.72 MI. OF ROUTE 156
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 5 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 36,500 vehicles per day and is 33 years old.
Its sufficiency rating of 65.1 is above the national average of 63.6.
The NBI records a navigation clearance of 81 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge has some features that may be challenging for travelers with bridge anxiety. See the tips below for a more comfortable crossing.
This bridge is 2549 feet long — a longer crossing, over 1 minute.
A standard bridge design.
About 81 feet above ground — an elevated crossing, similar to a 5-10 story building.
About 36,500 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 77 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1993
33 years old
Structure Type
Prestressed Concrete (Continuous) Segmental Box Girder
Total Length
2,549 ft
776.9 m
Deck Width
77 ft
23.4 m
Spans
11
sections between supports
Max Span
275 ft
longest unsupported section (83.8 m)
Traffic Lanes
4 lanes
One-way traffic
Clearance Below
81 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
36,500vehicles/day
41.31871°N, 72.34790°W
Prestressed Concrete (Continuous) Segmental Box Girder
A prestressed concrete box beam bridge combines hollow box sections with prestressing technology, enabling longer spans with reduced weight and material usage.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Connecticut to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.