The Golden Gate Bridge uses 80,000 miles of wire in its cables.
The Golden Gate Bridge uses 80,000 miles of wire in its cables.
Wow, there are a lot of bridges here... one second please.
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 7 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 7,550 vehicles per day and is 57 years old.
Its sufficiency rating of 72.7 is above the national average of 63.6.
For travelers with bridge anxiety
This bridge is likely to be a comfortable crossing for most travelers.
This bridge is 47 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
No height data available — likely a standard overpass height.
About 7,550 vehicles cross daily — light traffic, a smooth crossing.
The deck is 41 feet wide with 2-3 lanes — moderate width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1969
57 years old
Structure Type
Concrete (Continuous) Slab
Total Length
47 ft
14.3 m
Deck Width
41 ft
12.5 m
Spans
3
sections between supports
Max Span
18 ft
longest unsupported section (5.5 m)
Traffic Lanes
2 lanes
One-way traffic
Daily Traffic
7,550vehicles/day
41.61823°N, 122.51539°W
Concrete (Continuous) Slab
A concrete slab bridge is a simple, solid concrete deck that acts as both the structural support and driving surface. Common for short spans, they are durable and low-maintenance.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track California to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.