Why did the bridge go to therapy? It had too many spans of anxiety.
Why did the bridge go to therapy? It had too many spans of anxiety.
What did one bridge say to the other? 'You're looking a bit stressed.'
over U.S. 101 MARINA LAGOON
04-SM-092-R11.78-SM
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 7 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 55,500 vehicles per day and is 55 years old.
Its sufficiency rating of 71.9 is above the national average of 63.6.
The NBI records a navigation clearance of 17 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge has some features that may be challenging for travelers with bridge anxiety. See the tips below for a more comfortable crossing.
This bridge is 4362 feet long — an extended crossing, several minutes.
A standard overpass design with solid barriers on each side.
About 17 feet above ground — moderate height, similar to a 3-5 story building.
About 55,500 vehicles cross daily — heavy traffic, congestion likely during rush hours.
The deck is 42 feet wide with 2-3 lanes — moderate width.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1971
55 years old
Structure Type
Prestressed Concrete (Continuous) Box Beam (Multiple)
Total Length
4,362 ft
1329.5 m
Deck Width
42 ft
12.7 m
Spans
95
sections between supports
Max Span
208 ft
longest unsupported section (63.4 m)
Traffic Lanes
3 lanes
One-way traffic
Clearance Below
17 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
55,500vehicles/day
37.55246°N, 122.30239°W
Prestressed Concrete (Continuous) Box Beam (Multiple)
A prestressed concrete box beam bridge combines hollow box sections with prestressing technology, enabling longer spans with reduced weight and material usage.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track California to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.