What did one bridge say to the other? 'You're looking a bit stressed.'
What did one bridge say to the other? 'You're looking a bit stressed.'
Analyzing deck conditions, superstructure ratings, and bad puns...
over BONITA ROAD
11-SD-805-7.76
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 5 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 272,000 vehicles per day and is 51 years old (reconstructed in 2014).
Its sufficiency rating of 63.2 places it below the national average of 63.6.
The NBI records a navigation clearance of 15 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 297 feet long — a short crossing, about 10-15 seconds.
A standard overpass design with solid barriers on each side.
About 15 feet above ground — standard overpass height.
About 272,000 vehicles cross daily — very heavy traffic, high congestion risk.
The deck is 197 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1975
51 years old (rebuilt 2014)
Structure Type
Prestressed Concrete (Continuous) Box Beam (Multiple)
Total Length
297 ft
90.4 m
Deck Width
197 ft
60.0 m
Spans
3
sections between supports
Max Span
160 ft
longest unsupported section (48.9 m)
Traffic Lanes
12 lanes
Two-way traffic
Clearance Below
15 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
272,000vehicles/day
32.64813°N, 117.06140°W
Prestressed Concrete (Continuous) Box Beam (Multiple)
A prestressed concrete box beam bridge combines hollow box sections with prestressing technology, enabling longer spans with reduced weight and material usage.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track California to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.