Analyzing deck conditions, superstructure ratings, and bad puns...
Analyzing deck conditions, superstructure ratings, and bad puns...
The average US bridge is 48 years old. That's a lot of birthday candles.
over HIGHLAND-NB 101 ON RAMP
07-LA-101-7.84-LA
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Poor overall condition rating of 4 out of 9. This bridge is classified as being in poor condition, meaning one or more structural components have significant deterioration. Poor condition does not mean the bridge is unsafe to drive on, but it does mean repairs or replacement may be needed.
The bridge carries 145,500 vehicles per day and is 72 years old (reconstructed in 1977).
Its sufficiency rating of 51.2 places it below the national average of 63.6.
The NBI records a navigation clearance of 17 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 449 feet long — a short crossing, about 10-15 seconds.
A standard overpass design with solid barriers on each side.
About 17 feet above ground — moderate height, similar to a 3-5 story building.
About 145,500 vehicles cross daily — very heavy traffic, high congestion risk.
The deck is 65 feet wide with 3-4 lanes — standard width.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1954
72 years old (rebuilt 1977)
Structure Type
Concrete (Continuous) Box Beam (Multiple)
Total Length
449 ft
136.9 m
Deck Width
65 ft
19.8 m
Spans
5
sections between supports
Max Span
155 ft
longest unsupported section (47.2 m)
Traffic Lanes
4 lanes
One-way traffic
Clearance Below
17 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
145,500vehicles/day
34.11169°N, 118.33545°W
Concrete (Continuous) Box Beam (Multiple)
A concrete box beam bridge uses hollow rectangular concrete sections. The box shape provides excellent torsional resistance and allows for longer spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track California to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.