Why did the bridge go to therapy? It had too many spans of anxiety.
Why did the bridge go to therapy? It had too many spans of anxiety.
If I had a dime for every bridge I've crossed, I'd have about ten bucks by now.
over S5-ELMGROVE ST OFF RAMP
07-LA-005-20.99-LA
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Fair overall condition rating of 5 out of 9. While it is not classified as structurally deficient, it shows some deterioration that is being monitored.
The bridge carries 288,660 vehicles per day and is 65 years old (reconstructed in 1975).
Its sufficiency rating of 61.5 places it below the national average of 63.6.
The NBI records a navigation clearance of 16 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 39 feet long — a quick crossing, under 5 seconds at highway speed.
A standard overpass design with solid barriers on each side.
About 16 feet above ground — moderate height, similar to a 3-5 story building.
About 288,660 vehicles cross daily — very heavy traffic, high congestion risk.
The deck is 137 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1961
65 years old (rebuilt 1975)
Structure Type
Prestressed Concrete Slab
Total Length
39 ft
11.9 m
Deck Width
137 ft
41.8 m
Spans
1
sections between supports
Max Span
39 ft
longest unsupported section (11.9 m)
Traffic Lanes
8 lanes
Two-way traffic
Clearance Below
16 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
288,660vehicles/day
34.08601°N, 118.23199°W
Prestressed Concrete Slab
A prestressed concrete slab bridge uses a flat concrete deck that has been pretensioned for additional strength. Efficient for short to medium spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track California to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.