Why did the bridge go to therapy? It had too many spans of anxiety.
Why did the bridge go to therapy? It had too many spans of anxiety.
The Brooklyn Bridge was sold to gullible tourists so many times it became a saying.
over CAMPBELL CR E FRONTAGE
MILE POINT 0.6
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Good overall condition rating of 9 out of 9. It is in good structural condition and is not classified as structurally deficient.
The bridge carries 1,400 vehicles per day and is 13 years old.
Its sufficiency rating of 81.4 is above the national average of 63.6.
The NBI records a navigation clearance of 12 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 180 feet long — a short crossing, about 10-15 seconds.
A standard overpass design with solid barriers on each side.
About 12 feet above ground — standard overpass height.
About 1,400 vehicles cross daily — light traffic, a smooth crossing.
The deck is 26 feet wide with 1-2 lanes — a narrower crossing.
This bridge crosses over water. Focus on the road ahead — the water is far below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
2013
13 years old
Structure Type
Prestressed Concrete Tee Beam
Total Length
180 ft
54.9 m
Deck Width
26 ft
7.9 m
Spans
2
sections between supports
Max Span
88 ft
longest unsupported section (26.7 m)
Traffic Lanes
1 lane
One-way traffic
Clearance Below
12 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
1,400vehicles/day
61.17556°N, 149.85806°W
Prestressed Concrete Tee Beam
A prestressed concrete tee beam bridge combines the T-shaped cross-section with prestressing technology for improved load capacity and longer spans.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Alaska to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.