Almost there! Just bridging the gap...
Almost there! Just bridging the gap...
Over 5 billion bridge crossings happen every single day in America.
over MORRIS AVE * RR
22ND ST- 1ST S TO 1ST N
Parametric wireframe generated from real NBI dimensions. Drag to rotate, scroll to zoom.
Loading 3D model...
This bridge has a Poor overall condition rating of 3 out of 9. This bridge is classified as being in poor condition, meaning one or more structural components have significant deterioration. Poor condition does not mean the bridge is unsafe to drive on, but it does mean repairs or replacement may be needed.
The bridge carries 14,000 vehicles per day and is 111 years old.
Its sufficiency rating of 28.9 places it below the national average of 63.6.
The NBI records a navigation clearance of 20 feet — the minimum vertical space below the bridge deck. The total height of the bridge structure (including towers, railings, and superstructure) may be higher.
For travelers with bridge anxiety
This bridge may cause some awareness for travelers with bridge anxiety, but has manageable characteristics.
This bridge is 715 feet long — a moderate crossing, about 30 seconds.
A standard overpass design with solid barriers on each side.
About 20 feet above ground — moderate height, similar to a 3-5 story building.
About 14,000 vehicles cross daily — moderate traffic, some congestion possible.
The deck is 75 feet wide with multiple lanes — easy to stay in a center lane.
This bridge crosses over land, not water — no water views below.
This comfort score is designed to help individuals with bridge anxiety plan their travel. All bridges in the National Bridge Inventory are regularly inspected and deemed safe for travel. This is not medical advice — if you experience severe anxiety, please consult a healthcare professional.
Year Built
1915
111 years old
Structure Type
Concrete Tee Beam
Total Length
715 ft
218.0 m
Deck Width
75 ft
23.0 m
Spans
18
sections between supports
Max Span
56 ft
longest unsupported section (17.2 m)
Traffic Lanes
5 lanes
Two-way traffic
Clearance Below
20 ft
navigation clearance under deck
Clearance height compared to familiar objects
Height shown is the navigation clearance below the bridge deck. The total height of the bridge structure (including towers and superstructure) may be higher.
Daily Traffic
14,000vehicles/day
33.51531°N, 86.80259°W
Concrete Tee Beam
A concrete tee beam bridge uses T-shaped cross-section beams where the top flange serves as part of the deck, efficiently using concrete in both compression and tension.
Learn more about this bridge typeNo ratings yet. Be the first to rate this bridge!
Sign in and track Alabama to receive alerts when new inspection data is published. Premium members get bridge-specific notifications.
Data from the National Bridge Inventory (NBI), maintained by the Federal Highway Administration (FHWA).
Data year: 2025. Conditions may have changed since the last inspection.
This information is provided for educational and informational purposes only. It should not be used as the sole basis for any decisions related to bridge safety or transportation planning. Always consult official sources and local authorities for the most current data.